Peach Bottom Nuclear Generating Station

Location:

Delta, Pennsylvania
39.7589, -76.2692

Owner: 

Exelon

Population Within 10 Miles:

68,588

On-Site Dry Casks: 

Yes

NRC Contact Information: 

Reactors

Peach Bottom Unit 1

Reactor Type: 

High Temperature Gas-Cooled Reactor

Operational Status:

Shut Down

Licensed to Operate:

1/24/1966 to 10/31/1974

Peach Bottom Unit 2

Reactor Type: 

Boiling Water Reactor

Operational Status:

Operating

Licensed to Operate:

10/25/1973 to 8/8/2033

Peach Bottom Unit 3

Reactor Type: 

Boiling Water Reactor

Operational Status:

Operating

Licensed to Operate:

7/2/1974 to 7/2/2034

Take Action